# What does this PR do?
[Provide a short summary of what this PR does and why. Link to relevant
issues if applicable.]
Updated `uv.lock` to reflect the latest versions of `llama-models`,
`llama-stack`, and `llama-stack-client` (bumped to 0.1.2). This ensures
dependency consistency and avoids potential issues with outdated package
references.
Added `uv-sync` hook from `uv-pre-commit` repository to ensure
synchronization of dependencies.
Signed-off-by: Sébastien Han <seb@redhat.com>
[//]: # (If resolving an issue, uncomment and update the line below)
[//]: # (Closes #[issue-number])
## Test Plan
[Describe the tests you ran to verify your changes with result
summaries. *Provide clear instructions so the plan can be easily
re-executed.*]
[//]: # (## Documentation)
[//]: # (- [ ] Added a Changelog entry if the change is significant)
Signed-off-by: Sébastien Han <seb@redhat.com>
# What does this PR do?
Switch to uv for dependency management and update CONTRIBUTING.md with
new setup instructions. Add missing dev dependencies to pyproject.toml
and apply minor formatting fixes.
Signed-off-by: Sébastien Han <seb@redhat.com>
- [ ] Addresses issue (#issue)
## Test Plan
Please describe:
- tests you ran to verify your changes with result summaries.
- provide instructions so it can be reproduced.
## Sources
Please link relevant resources if necessary.
## Before submitting
- [x] This PR fixes a typo or improves the docs (you can dismiss the
other checks if that's the case).
- [ ] Ran pre-commit to handle lint / formatting issues.
- [ ] Read the [contributor
guideline](https://github.com/meta-llama/llama-stack/blob/main/CONTRIBUTING.md),
Pull Request section?
- [ ] Updated relevant documentation.
- [ ] Wrote necessary unit or integration tests.
Signed-off-by: Sébastien Han <seb@redhat.com>